Clyde Bergemann Senior Thermal
home print this page
Contact     |     Location     |     Sitemap
Clyde Bergemann Solutions
Company Information
Long Wall Coal Mining

 

BiomassSolutions for Long Wall Coal Mining

TOP LOADING TWIN PULL TIGER BRETBY

Clyde Bergemann Senior Thermal (CBST) has been involved in long wall coal mining since it first began. From early on CBST has been at the forefront of development when it came to long wall cable protection.

CBST invented the Top Loading Twin Pull Tiger Bretby in Australia and since this time has expanded its market coverage to the USA.

Features include:

  • The ability of the Bretby to remain in the panline to remove both power cable and water hose
  • Huge reduction in man hours to replace cable or hose
  • Repairs can be made in the panline
  • Power cable and water hose can be accessed at any point on the panline regardless of where the shearer stops
  • Unique locking device allows the top or bottom to be removed simply
  • Unique Dovetail joining systems

 

CLICK HERE TO ENQUIRE

© 2011 Clyde Bergemann Senior Thermal